Photos tagged Building

876 photos

  • Just cuttin apart my cupboards
  • Bout to finally replace this countertop microwave with a proper built-in.
  • Tap plumbing
  • Beer fridge!
  • CO2 tank mounted, fridge in place
  • Keg shelf and beer lines
  • Manifold in... but not yet mounted.
  • Gas and Beer lines ran
  • Insulated tap box
  • Wall patched up and tap box door installed
  • Pipes insulated and lines ran
  • TapsL mounted
  • Routing cool air from the freezer to the tap box
  • Mountin the taps
  • Ports in
  • Plumbing cleaned up and test fit
  • Tap-box mounted and plumbed intot he wall
  • Sealed up the ports on the top of the fridge
  • Tap box sealed up and plumbed into the wall
  • Parts all painted up
  • Temp support for the air ducts
  • Paintin up the shelves and tap box door
  • Oh yeah!
  • Time to paint!
  • Insulated tap box
  • Test fittin the keg platform/shelf
  • Cuttin into the wall for the taps
  • Holes drilled
  • Holes bored.
  • Hole #2
  • This is not sketchy at all
  • First hole in
  • Decided to move the hole after feeling around through the pilot hole.
  • Just piercing the skin before boring all the way through.
  • Crappy sketch of my plan
  • Refinishing the shed shutters
  • Made a cup holder for the hammock
  • Just finished painting this garage door
  • Finally got good enough weather to finish painting these basement windows
  • I'm gonna install it on the hardwood with my so sharp screws and my electric portable drill
  • Jeep door cart
  • Jeep doors on my cart
  • Made this Jeep door cart
  • Turned out to be a nice piece of white oak. Planers are cool.
  • This is a gnarly old shelf leftover from our demo. Gonna try to clean it up
  • Homebrew pump switch I threw together with some scraps
  • Rigged up this pump switch during the homebrew mash, ha. Safety first
  • Guest bedroom closet doors finished off
  • Mounting the sliding closet door pulls
  • Gettin ready to mount the sliding closet door hardware
  • Didn't get the rec room door quite measured right to account for the floor...
  • Rec room: floored and trimmed out
  • Rec room: Floored and trimmed
  • Trimming everything out
  • Rec room floor: down
  • Floor after the first evening. Ready to finish er off.
  • Puttin down floors with Rico
  • If there's one dude I love working with, it's Rico
  • Cutting door jambs during a meeting, heh
  • Underlayment: down
  • Vapor barrier down
  • Filled the low spots with 30# roofing felt before laying the floor
  • I cut 5/8" of drywall off the bottom of the drywall so that the floating floor could expand/contract under it... This is overkill, but I didn't want shoe mould.
  • Friday night party
  • Finished sliding door
  • Finishing this door AFTER it was installed was kind of annoying...
  • Sprayin that top coat
  • Ready to put down the top coats
  • Sliding door: stained
  • Bout to finish this sliding door
  • Built some new steps for the garage
  • Some poor labeling on the new set of steps that I decided to build
  • I hired one of my neighbors to put in the sliding door. They did a great job
  • Sliding closet doors hung
  • Spraying and cleaning
  • Sprayin
  • More doors
  • Another door mounted
  • Sprayin and sprayin
  • Top-coat stuff